BIG Work Week
Blacktop and Nature Playground
We are excited about all the changes happening this summer, including several facility upgrades.
This week, our entire blacktop area will be resurfaced. We saw lots of digging and prep work being done this morning.
THIS THURSDAY THE ENTIRE BLACKTOP WILL BE CLOSED as we expect them to lay the new surface.
Access to the Sweet, Spruce, and Stucco buildings will still be available via a walkway along the side of the drive and around the perimeter of the blacktop. We will have continued access to the Nature Playground.
Lemonade Lull on the Playground
Stop by for a refreshing lemonade THIS Thursday from 5 - 6 pm.
Because of the work being done on the blacktop, we will move our first summer social of 2018 to the Nature Playground.
Several families have signed up to bring home-baked cookies for PPP.
You can still sign up to bake cookies here. Let us know how many and what kind of cookies you will bring.
Pick up your child and then stop by. Remember that you are responsible for minding your children at social events as teachers will still have children in their care.
Enjoy a cool drink and take a look at the butterfly garden that is being planted as we continue to green our playground and enrich curriculum with this added element.
International Mud Day
We are currently planning for the blacktop closure for Mud Day. We will keep you posted.